Wire Harness Prototyping Guide
Master the prototyping process from initial samples to production-ready wire harnesses. Learn EVT, DVT, and PVT stages, first article inspection requirements, and best practices for successful production transition.

Why Prototyping Matters
Prototype wire harnesses are your first real-world test of a design. Before committing to full production, prototypes help verify that everything fits, functions, and performs as expected. While early versions don't need to be perfect, they must be accurate enough to identify potential issues.
cheaper to fix issues in prototype vs production
of design issues found before production
typical initial prototype lead time
Key Prototyping Objectives
Development Stages: EVT, DVT, PVT
The hardware development process follows three distinct validation stages. Understanding each stage helps you plan timelines, budgets, and resources effectively for wire harness development.
EVT - Engineering Validation Test
Prove the design works
EVT is the first prototype production that mimics final design functionality. The goal is to finalize the product's function and form using materials intended for the final version. This stage inspects the quality of each component.
Typical Quantities
5-12 prototypes depending on complexity and BOM cost
Technologies Used
Soft tooling, 3D-printed parts, hand assembly
EVT for Wire Harnesses
- • Verify connector compatibility and fit
- • Confirm wire routing and length accuracy
- • Test electrical continuity and performance
- • Validate crimping and termination quality
DVT - Design Validation Test
Prove manufacturing works
DVT tests the manufacturability of the product. You create 50-200 units using the same production process intended for mass production, then test these units to confirm reliability and durability. All production problems should be identified and corrected.
Typical Quantities
50-200 units (300-2000 for complex assemblies)
Key Requirements
Hard tools, production processes, test stations
DVT for Wire Harnesses
- • Run production-intent processes
- • Establish cycle times and labor standards
- • Validate test fixtures and procedures
- • Document first pass yield data
PVT - Production Validation Test
Prove production at scale
PVT is the final testing operation before production. The goal is to ensure the product is functional, made to correct specifications, and can be manufactured at scale. All aspects of manufacturing including QA/QC procedures must be finalized.
Typical Quantities
5-10% of planned first production run
Success Criteria
Production yields, quality metrics, cost targets
PVT for Wire Harnesses
- • Verify production line capability
- • Confirm quality at target volumes
- • Finalize work instructions and training
- • Validate packaging and shipping
| Stage | Quantity | Timeline | Primary Goal |
|---|---|---|---|
| EVT | 5-12 units | 2-4 weeks | Design function validation |
| DVT | 50-200 units | 4-8 weeks | Manufacturing validation |
| PVT | 5-10% of run | 2-4 weeks | Production readiness |
First Article Inspection (FAI)
First article inspection is a critical quality gate between prototyping and production. A single assembly is built and carefully inspected to verify that the final product will meet all specifications. Production only begins once the first article is fully approved.
What First Article Verifies
Prototype vs First Article
Early-stage samples for proof of concept, not proof of design. Uses rapid techniques.
Production-representative sample using final processes. Follows prototype, precedes production.
FAI Documentation
- Dimensional inspection report
- Electrical test data
- Visual inspection photos
- Material certifications
- Process documentation
Quality Checkpoints: Verify cut lengths result in correct finished dimensions. Confirm test setup data is locked from modification. Communicate any design improvement opportunities discovered during build. These measures greatly reduce production floor errors.
Prototyping Best Practices
Follow these proven practices to streamline your wire harness prototyping process and reduce time-to-production.
Stay Flexible and Adaptable
Inevitably, during the prototyping phase you'll encounter design flaws or potential manufacturing hurdles. This is expected—it's much easier to solve an issue in prototyping than during full-scale production. Embrace iteration.
Focus on Essential Documentation
Prototype drawings should focus on the essentials: key lengths, connector types, and basic routing. This lean approach helps teams iterate faster while still gathering valuable data. Connector design and overall length are the most critical aspects.
Use Rapid Prototyping Techniques
3D-printed connectors or temporary overmolds let engineers check dimensions and functionality quickly. Consider soft tooling and rapid-cut parts for early-stage validation before investing in hard tooling.
Test Early and Often
Don't wait until the end of a development stage to test. Continuous testing helps identify issues early when they're cheapest to fix. Establish test protocols from EVT and refine through each stage.
Plan for Production from Day One
Even in early prototyping, consider how the design will be manufactured at scale. Apply DFM (Design for Manufacturing) principles early to avoid costly redesigns later.
Document Everything
Create and maintain build notes throughout prototyping. Record what works, what doesn't, and why. This documentation becomes invaluable for production transfer and troubleshooting.
Transitioning to Production
A successful prototype-to-production transition requires careful planning and execution. Here's a checklist of critical elements to address.
Production Readiness Checklist
Design
- Drawings finalized and revision-controlled
- BOM locked with approved suppliers
- Engineering change notices complete
Process
- Work instructions documented
- Operator training completed
- Cycle times established
Quality
- Inspection criteria defined
- Test procedures validated
- Acceptance criteria documented
Supply Chain
- Component availability confirmed
- Lead times mapped
- Safety stock levels set
For more details on scaling from prototype to production, see our comprehensive guide on prototyping to production and wire harness documentation requirements.
"The most successful prototyping projects are those where the customer views prototypes as learning opportunities, not just checkboxes. Each iteration teaches us something valuable about the final design. Rushing through prototyping to save time often costs more in the long run through production issues and redesigns."
Frequently Asked Questions
How many wire harness prototypes do I need?
Typical prototype quantities are 5-12 units for EVT, 50-200 for DVT, and 5-10% of planned production volume for PVT. The exact number depends on testing requirements, design complexity, and approval processes.
What is the difference between a prototype and first article?
Prototypes are early-stage samples for proof of concept and design validation. First articles are production-representative samples built using final processes and materials, used to verify manufacturing readiness before full production release.
How long does wire harness prototyping take?
Initial prototypes typically take 2-4 weeks. First articles require 3-5 weeks including inspection and approval. The entire EVT-DVT-PVT cycle can span 3-6 months depending on complexity and iteration requirements.
What documentation is needed for prototyping?
Essential documentation includes assembly drawings with dimensions, bill of materials (BOM), connector pinouts, wire routing sketches, and testing requirements. First articles additionally require formal inspection reports and approval documentation.
Can prototypes be used in production?
Generally no. Prototypes may use different processes, materials, or assembly techniques than production units. However, properly built first articles that pass inspection can sometimes be used as production units.
Sources & Further Reading
Ready to Start Your Prototype?
Our team supports the full prototyping journey from initial concepts through first article approval and production release. Get expert guidance every step of the way.